Get Ready to Pass the C-P2W43-2023 exam Right Now Using Our SAP Certified Associate Exam Package [Q10-Q25]

Share

Get Ready to Pass the C-P2W43-2023 exam Right Now Using Our SAP Certified Associate Exam Package

Enhance Your Career With Available Preparation Guide for C-P2W43-2023 Exam

NEW QUESTION # 10
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question

  • A. The assignment of a control key with key externally processed operation is sufficient.
  • B. The assignment of a control key with the service indicator set is mandatory
  • C. The usage of a model service specification is mandatory.
  • D. The actual value entry can be recorded only via the service entry sheet

Answer: B,C


NEW QUESTION # 11
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by (annual performance/365)
  • B. Cycle length divided by (monthly performance x 12)
  • C. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • D. Cycle length divided by annual performance

Answer: D


NEW QUESTION # 12
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note:
There are 3 correct answers to this question

  • A. A technical object must be assigned to an order operation
  • B. Overall costs are dynamically summed up on the header level.
  • C. Purchase requisitions have the operation as account assignment.
  • D. Costs are stored only for the operation object
  • E. The settlement rule is maintained on the header level.

Answer: A,B,D


NEW QUESTION # 13
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP S/4HANA Core Data Services
  • B. SAP Predictive Analysis
  • C. SAP Asset Strategy and Performance Management
  • D. SAP Lumira Designer

Answer: A


NEW QUESTION # 14
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

  • A. Scheduling period
  • B. Call horizon
  • C. Scheduling indicator
  • D. End Date for Scheduling

Answer: A


NEW QUESTION # 15
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. A purchase requisition can be created automatically as soon as the order is saved.
  • B. A goods receipt can be posted after the maintenance order is technically completed.
  • C. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • D. A purchase order is created automatically as soon as the order is saved.
  • E. The maintenance order can be set to TECO before the invoice is created

Answer: A,C,E


NEW QUESTION # 16
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Open purchase orders are recompiled.
  • B. Referenced notifications are put in Process again.
  • C. Open reservations are recompiled.
  • D. Open purchase requisitions are recompiled

Answer: C,D


NEW QUESTION # 17
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Scheduling type
  • B. Call horizon
  • C. Initial/subsequent buffer
  • D. Package offset

Answer: C


NEW QUESTION # 18
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Scheduling period
  • B. Factory calendar
  • C. Start date
  • D. Scheduling indicator

Answer: A,C


NEW QUESTION # 19
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question.

  • A. Capacity category
  • B. Organizational unit (HR)
  • C. Calculation key
  • D. Planner group

Answer: A,B


NEW QUESTION # 20
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question

  • A. It limits the types of characters in the edit mask to Alpha and Numeric.
  • B. It defines the allowed characters for a functional location
  • C. It sets the hierarchy levels of the functional location structure.
  • D. It restricts the number of hierarchical levels to no more than 6

Answer: A,C


NEW QUESTION # 21
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

  • A. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • B. For the combination of order type and planner group, you can decide when reservations are created
  • C. All open reservations are closed when the maintenance order is set to TECO.
  • D. Reservations are created only after a material availability check has been performed

Answer: A,C


NEW QUESTION # 22
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

  • A. The order moves to the Preparation phase once it is approved and released
  • B. The configuration of the order type decides whether you use Resource Scheduling or not.
  • C. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • D. Maintenance Planning Buckets give you a list of non-approved notifications

Answer: A,C


NEW QUESTION # 23
What do you have to consider when planning maintenance work that is to be carried out by an external company?

  • A. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
  • B. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
  • C. In the control key assigned to the order operation, the "Service" indicator must always be activated.
  • D. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.

Answer: C


NEW QUESTION # 24
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question

  • A. The cost center of the superior equipment
  • B. The individual maintenance of the cost center in the equipment master record
  • C. The cost center of the related maintenance work center
  • D. The reference functional location of the superior functional location

Answer: A,B


NEW QUESTION # 25
......

Get Special Discount Offer of C-P2W43-2023 Certification Exam Sample Questions and Answers: https://www.free4dump.com/C-P2W43-2023-braindumps-torrent.html

New C-P2W43-2023 Dumps For Preparing SAP Certified Associate Certified SAP Exam Well: https://drive.google.com/open?id=1FVvOL-iQnDW5irYSEqxNuBJ_AFUNVCpx