
[Aug 09, 2023] Valid E-S4HCON2023 Test Answers & E-S4HCON2023 Exam PDF
Valid SAP Certified Technology Specialist E-S4HCON2023 Dumps Ensure Your Passing
NEW QUESTION # 20
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During uptime
- B. During downtime
- C. During SPDD
- D. Post-downtime
Answer: A,D
NEW QUESTION # 21
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the business downtime
- B. The start of the Execution roadmap step
- C. The start of the business downtime
- D. The end of the database migration
Answer: A
NEW QUESTION # 22
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Before the downtime starts
- B. At the end of the downtime
- C. Early in the downtime
- D. As part of the cleanup process
Answer: A
NEW QUESTION # 23
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the most recent entries in SAPup.log
- B. Check the messages shown by the SUM UI
- C. Check the most recent entries shown in file sapevt.trc
- D. Check the system log (transaction SM21) of the SAP system
Answer: A,B
NEW QUESTION # 24
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 25
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
- A. Assign the transport request as a modification adjustment transport
- B. Release the transport request containing the modification adjustment
- C. Manually activate the adjusted dictionary objects
- D. Create "modified* versions of the objects that you need to adjust
Answer: A,D
NEW QUESTION # 26
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of upgrade and language data from the download directory in phase TABIM UPG
- B. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- C. Import of dictionary objects from the download directory in phase DDIC_UPG
- D. Activation of dictionary objects in phase ACT_UPG
- E. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
Answer: A,C,D
NEW QUESTION # 27
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Switch to new repository (EU_SWITCH)
- B. Modification adjustment (SPDD)
- C. Activation of dictionary objects (ACT_UPG)
- D. Conversion of application tables (PARCONVJJPG)
Answer: B,C
NEW QUESTION # 28
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
Answer: D
NEW QUESTION # 29
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
- A. During the SUM technical downtime
- B. Before the start of the SUM technical downtime
- C. During the Execution roadmap step
- D. After SUM has ended
Answer: A
NEW QUESTION # 30
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION # 31
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- D. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
Answer: C
NEW QUESTION # 32
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.
- A. Homogenous system copy
- B. Release upgrade
- C. Database migration
- D. Support Package Stack update
- E. Dual Stack split
Answer: B,C,D
NEW QUESTION # 33
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phases EU_IMPORT*
- B. Phase RUN_RSDBSCPY
- C. Phase RUN_RSPTBFIL _ISUTABU
- D. Phase DOWNCONF_DTTRANS
- E. Phases DIFF*
Answer: A,D,E
NEW QUESTION # 34
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the corresponding R3trans log files of this phase
- B. In the job log for the corresponding job in SM37 (Job Overview)
- C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
Answer: B,D
NEW QUESTION # 35
......
E-S4HCON2023 Dumps Real Exam Questions Test Engine Dumps Training: https://www.free4dump.com/E-S4HCON2023-braindumps-torrent.html
E-S4HCON2023 exam dumps and online Test Engine: https://drive.google.com/open?id=1P5vAMhuyLXcWsKnJPKPzj_Pk2GTCOK_N