Get Latest Sep-2021 Conduct effective penetration tests using Free4Dump C-TS422-2020 exam [Q48-Q73]

Share

Get Latest [Sep-2021] Conduct effective penetration tests using  Free4Dump C-TS422-2020

Penetration testers simulate C-TS422-2020 exam PDF

NEW QUESTION 48
For what production type are production orders used?

  • A. Process manufacturing processes
  • B. Period and quantity-oriented production
  • C. Discrete manufacturing processes
  • D. Replenishment controlled by control cycles

Answer: C

 

NEW QUESTION 49
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By period
  • B. By material type
  • C. By industry
  • D. By plant

Answer: A,D

 

NEW QUESTION 50
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.

  • A. Using quotations for internal and external procurement
  • B. Using purchase orders for external procurement
  • C. Using run schedule quantities for in-house production
  • D. Using stock transfer reservations for stock transfer
  • E. Using purchasing costs for automated source prioritization

Answer: B,C,D

 

NEW QUESTION 51
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for product-related alerts.
  • C. Create object selection variant for resource-related alerts
  • D. Create object selection variant for transportation lane-related alerts.
  • E. Assign the overall profile to the authorization profile.

Answer: A,B,C

 

NEW QUESTION 52
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The least restrictive status
  • C. The cross-plant status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 53
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Quantity
  • B. Installation point
  • C. Item type
  • D. Scrap percentage

Answer: A,B

 

NEW QUESTION 54
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Float after production
  • B. Setup time
  • C. Total replenishment lead time
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 55
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Indicator Relevant for finite scheduling must be set.
  • C. PRT Availability check must be set.
  • D. Checking rule and group must be assigned.

Answer: A,B

 

NEW QUESTION 56
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.

  • A. Add the agreement to the source list and mark itfor MRP relevance.
  • B. Add the agreement to the quota arrangement and mark it for MRP relevance.
  • C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Answer: A,C

 

NEW QUESTION 57
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 58
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When multiple operations are maintained for one product
  • C. When alternate resourcesare used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C

 

NEW QUESTION 59
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used by ATP to determine the priority of alternative components.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by product costing to determine how costs are rolled up.

Answer: B,D

 

NEW QUESTION 60
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Rate routing
  • D. Replenishment strategy

Answer: A

 

NEW QUESTION 61
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether a material master fieldis required, changeable, displayed, or hidden
  • B. Which material master views can be maintained
  • C. Whether material numbers are assigned internally or externally
  • D. Which transaction you can use to create a new material

Answer: A,B

 

NEW QUESTION 62
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging (on/off)
  • B. Finiteness level (0...1)
  • C. Planning mode (bucket/sequence)
  • D. Direction (forward/backward)
  • E. Scheduling control (finite/infinite)

Answer: C,D,E

 

NEW QUESTION 63
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Purchase requisition
  • C. Production order
  • D. Stock transport order
  • E. Planned order

Answer: A,B,E

 

NEW QUESTION 64
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Sales Order BOM
  • C. Functional Location BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 65
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Supply Network Planning (SNP)
  • B. Capacity Requirements Planning (CRP)
  • C. Material Requirements Planning (MRP)
  • D. Demand Planning (DP)

Answer: C

 

NEW QUESTION 66
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers providing a cumulative available capacity for production
  • B. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • D. A group of work centers in a production line beingused in sequence for production

Answer: A

 

NEW QUESTION 67
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of goods receipt for the product
  • B. Posting of production costs to the production cost collector
  • C. Archiving of documents for assembly scrap
  • D. Material staging for next order in sequence
  • E. Reduction of associated capacity requirements

Answer: A,B,E

 

NEW QUESTION 68
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. In-house production time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. Planned delivery time

Answer: A,D

 

NEW QUESTION 69
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the phantom item indicator for the phantom assembly in the BOM.
  • B. Change the special procurement key of the phantom assembly in the BOM.
  • C. Change the item category of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D

 

NEW QUESTION 70
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the minimum order quantity.
  • B. Use the MRP type for vendor managed inventory.
  • C. Use the fixed lot size procedure.
  • D. Use the reorder point.

Answer: C

 

NEW QUESTION 71
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Capacity requirements chart
  • D. Orders (dispatched) chart

Answer: A,C

 

NEW QUESTION 72
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

  • A. Material
  • B. Plant
  • C. Production version
  • D. Work center

Answer: A,D

 

NEW QUESTION 73
......

Tested Material Used To C-TS422-2020 Test Engine: https://www.free4dump.com/C-TS422-2020-braindumps-torrent.html

Steps Necessary To Pass The C-TS422-2020 Exam: https://drive.google.com/open?id=1kLqydQSWpI_VoduMU58SXJMd982L9Mq6