To pass the MB-335 exam, candidates must demonstrate their expertise in various areas of Supply Chain Management. They must have a deep understanding of the application's functionalities, including the ability to customize and configure it to meet specific business requirements. Additionally, they must be able to identify and troubleshoot issues that may arise during the implementation and configuration of Dynamics 365 Supply Chain Management.

 

NEW QUESTION # 41
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service.
* Create a vendor resource then create a work cell for outsourced painting and add the resource to the work cell.
* Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity.
* Create a server term to tie the purchase agreement to the activity.
Does the solution meet the goal?

  • A. Yes
  • B. No

Answer: B

Explanation:
The solution does not meet the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a vendor warehouse for the subcontracting vendor. This step is missing in the solution, but it is required to track the inventory that is located at the vendor's site. You need to create a warehouse that is assigned to the vendor account and set it as vendor-managed1.
Create a vendor resource and add it to a new work cell for outsource painting. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity. This step is incorrect, because you need to add the service item (SP-01) as the product of the process activity, not the component to be painted1. The service item represents the subcontracting service that is provided by the vendor. You also need to select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service. This step is correct, because you need to create a purchase agreement that defines the terms and conditions for purchasing the subcontracting service from the vendor1. You also need to add a purchase agreement line for SP-01 and specify the quantity and price of the service.
Create a server term to tie the purchase agreement to the activity. This step is incorrect, because you need to create a service term that links the purchase agreement line to the production flow process activity1. A service term defines how a service item is consumed in production and how it is invoiced by the vendor.
1: Activity-based subcontracting


NEW QUESTION # 42
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Set all BOM lines warehouse to the production warehouse.
  • B. Set all the BOM lines to resource consumption.
  • C. Set the input warehouse on the resource to the vendor warehouse.
  • D. Set the operation route type as Standard.
  • E. Set the operation route type as Vendor.

Answer: A,C,E


NEW QUESTION # 43
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item as the picking activity.
* Create a service term on the activity to tie the purchase agreement to the activity.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: B

Explanation:
The solution meets the goal. Here is the explanation:
* To create a subcontracting activity for the painting service, you should use the following steps1:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01. This step is correct, because you need to create a purchase agreement that defines the terms and conditions for purchasing the subcontracting service from the vendor1. You also need to add a purchase agreement line for SP-01 and specify the quantity and price of the service.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the
* work cell. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
* Create a production flow process activity using the painting work cell and the service item as the picking activity. This step is correct, because you need to create a process activity that represents the subcontracting service in the production flow1. You also need to specify the painting workcell as the resource group and SP-01 as the product of the process activity. You also need to select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
* Create a service term on the activity to tie the purchase agreement to the activity. This step is correct, because you need to create a service term that links the purchase agreement line to the production flow process activity1. A service term defines how a service item is consumed in production and how it is invoiced by the vendor.
1: Activity-based subcontracting


NEW QUESTION # 44
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 45
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.

Answer:

Explanation:

Explanation
A close-up of a white background Description automatically generated


NEW QUESTION # 46
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels.
Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration


NEW QUESTION # 47
You need to resolve the shop supervisor's issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE:Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 48
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen A client subcontracts production work to a vendor for production operations.
You need to model subcontracting of route operations in production orders.
Solution: Ensure that the service product is stocked and is part of the Bill of Materials.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: B


NEW QUESTION # 49
A manufacturer uses Dynamics 365 Supply Chain Management.
The engineering department constantly revises product designs to stay current with the latest technology. The customer service department places orders lot the products but frequently adds a prototype product version that is not yet operational.
The manufacturer requites a solution that notifies customer service if a prototype version is selected on a sales order.
You need to configure the solution.
What should you configure?

  • A. engineering product category
  • B. version number rule
  • C. product lifecycle stales
  • D. product release policy

Answer: C


NEW QUESTION # 50
A company uses multiple Dynamics 365 applications to track and repair equipment.
The company wants to improve its repair order process. Repair technicians frequently encounter unexpected issues daily. The technicians must be empowered to address the issues and create new work orders by doing the following:
* Provide step-by-step, just-in-time training for work order completion in the field by using videos and text.
* Document work order creation in a single, printable document.
* Report on the use of hands-on training.
You need to implement a solution forth requirements.
Which solution should you implement for each requirement? To answer, drag the appropriate solutions to the correct requirements. Each solution may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

Answer:

Explanation:

Explanation:
To implement a solution for the requirements, you should use the following solutions:
* Just-in-time training: You should use Dynamics 365 Guides. This solution allows you to create interactive, step-by-step learning experiences for repair technicians in the field. You can use videos, images, and text to provide instructions and tips for work order completion. You can also use mixed reality tools to overlay holograms on physical objects and guide technicians through complex tasks.
* Work order creation document: You should use Dynamics 365 Supply Chain Management. This solution allows you to create and manage work orders for equipment maintenance and repair. You can use the Work order page to enter the details of the work order, such as the customer, the equipment, the service tasks, the materials, and the costs. You can also print a work order report that summarizes the information in a single document.
* Training reporting: You should use Dynamics 365 Guides. This solution allows you to track and analyze the usage and effectiveness of your guides. You can use Power BI dashboards to view metrics such as completion rates, duration, errors, and feedback for each guide and step. You can also filter the data by date, location, operator, or device.
[What is Dynamics 365 Guides?] : [Work orders overview] : [Print a work order report] : [Analyze guide effectiveness]


NEW QUESTION # 51
A company implements Dynamics 365 Supply Chain Management.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 52
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.
Does the solution meet the goal?

  • A. Yes
  • B. No

Answer: B

Explanation:
The solution does not meet the goal. Here is the explanation:
* To ensure that the system is set up to support the process manufacturing of pain-relieving lotions, you should use the following steps1:
* Create a product master for the lotion and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
* Create a constraint-based product configuration model for the lotion and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the lotion. For example, you can add an attribute for ingredient A and specify its concentration
* as a value. You can also add constraints to limit the combinations of attribute values that are allowed.
* Create a price model for the lotion and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for ingredient A and specify different prices for different concentrations.
* Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the lotion. You can also view the price details and see how each price component contributes to the total price.
* The solution in the question is not correct, because it does not involve constraint-based product configuration or price models. Creating a dimension-based product master with variants and using trade agreements to specify different pricing would not allow you to handle different concentrations of ingredients or calculate prices based on attributes.
1: Product configuration overview : Create constraint-based configuration : Price models


NEW QUESTION # 53
You are responsible for product and formula maintenance for a paint manufacturer. You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately. You need to set up the formula line for the pigment.
Which formula feature should you use?

  • A. Step consumption
  • B. Scalable
  • C. Pegged supply
  • D. Variable

Answer: B


NEW QUESTION # 54
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 55
A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.
The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.
You need to define the production life cycle stages.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation
To define the production life cycle stages, you should perform the following actions in sequence:
Create a production order. A production order is a document that authorizes the production of a specific product or product variant in a given quantity on a specific date1. You can create a production order manually, from a sales order line, or from master planning execution2.
Estimate the order. Estimating a production order calculates the material and capacity requirements for the order based on the bill of materials (BOM) and the route3. You can also estimate the cost and revenue of the order based on the planned consumption and output.
Schedule production jobs. Scheduling production jobs determines the start and end dates and times for each operation in the route based on the available capacity, efficiency, and calendar of the resources.
You can use either operations scheduling or job scheduling methods to schedule production jobs.
Release the order. Releasing a production order makes it available for picking, production, and reporting activities. You can release an order manually or automatically based on a release rule that specifies criteria such as site, warehouse, status, priority, or start date.
Generate a picking list. A picking list is a document that lists the materials that must be picked from inventory and consumed for production. You can generate a picking list for an entire production order or for selected jobs or operations within an order.
1: Production process overview 2: Production order lifecycle overview 3: Estimate a production order :
[Estimate cost and revenue for a production order] : [Schedule production jobs] : [Scheduling methods] :
[Release a production order] : [Release rules] : [Picking list overview] : [Generate picking lists]


NEW QUESTION # 56
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create an exclusive restricted product list for California and add the motorcycle part to the list.
  • B. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
  • C. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.
  • D. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

Answer: A,B

Explanation:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/
Topic 3, Case Study 3 Adventure Works
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the button to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
The Street Kid YOLO models sell in different volumes depending on the market.
The creation of production orders for bicycles occurs monthly and is based on historical sales.
Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process.
As each step is completed, the respective section is completed and signed off by a production worker.
The completed paper is used in the put-away process by the warehouse workers.
Financials
The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
An updated model of a bicycle with new parts will be maintained as a new item and have a new price.
However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
A single pilot limited-edition bicycle is created as a proof of concept.
Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
Sales price must be auto calculated after the cost price is derived.
Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
All items except for the frame in the prototype process are considered finished items and can be sold individually.
The frame items require modifications in accordance with the manufacturing process as well as painting.
Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
AWIN must be able to sell only standard model bicycles.
AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
Warehouse workers must use the Warehouse Management mobile application to manage all inventory inbound and outbound from the warehouse.
Bicycle manufacturing
The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
Standard model bicycle production scheduling must be configured to start as soon as possible.
Bicycle components must be automatically reserved when the item is released to the production floor.
Standard model bicycle production must be automatically created on a predefined schedule.
As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
The system must log the immediate consumption of BOMs for traceability.
All inventory is warehouse enabled.
Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary.
The limited-edition bicycle will be designed for charity events and be produced for the summer season.
The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of
50 hand-painted designs representing the charity of the customer's choosing.
A limited run of 100 bicycles must be created.
The limited-edition bicycles must use the same production process as the standard model bicycles.
The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
Frames must be painted in-house.
Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
When an order for the new limited-edition bicycle is created, payment must be provided.
An approval for an order must exist for the order to be processed.
Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 57
A company uses Dynamics 365 Supply Chain Management for Process manufacturing.
You are reviewing the planned production orders for the next two weeks. There are several production orders for the same product. One order is scheduled to run the week after another order.
You need to optimize the planned production orders.
What should you do?

  • A. Rerun master planning. Select the dynamic plan with a coverage time fence of two weeks.
  • B. In Planned orders, combine the production orders.
  • C. Firm the orders.
  • D. Rerun master planning. Select the static plan with a coverage time fence of two weeks.

Answer: A


NEW QUESTION # 58
A company uses Dynamics 365 Supply Chain Management.
The marketing group needs to be able to view a manufacturer's suggested retail price (MSRP) for a new bill of materials (BOM) item when the cost of the BOM item is calculated.
You need to configure the functionality.
What should you do?

  • A. Add a profit setting percentage to a cost group.
  • B. Set the sales price model field on the calculation group to item sales price.
  • C. Add a profit setting percentage to a calculation group.
  • D. Use the category price rules to generate a trade agreement with the sales price.
  • E. Add a profit setting percentage to the released BOM product.

Answer: D

Explanation:
* To view the manufacturer's suggested retail price (MSRP) for a new bill of materials (BOM) item, you need to configure a calculation group with a profit setting percentage. A calculation group is a group of
* settings that determine how the cost and sales price of a BOM item are calculated1. A profit setting percentage is a percentage that is added to the cost of a BOM item to calculate the sales price2. You can specify a profit setting percentage for each calculation group on the Calculation groups page3.
* When you calculate the cost and sales price of a BOM item, you must select a calculation group on the Calculations page. The calculation group determines the cost model and sales price model that are used for the BOM calculation. The cost model defines how the cost of the BOM item is calculated based on the cost categories and cost groups of the components and operations. The sales price model defines how the sales price of the BOM item is calculated based on the profit setting percentage and the cost model.
* By using a calculation group with a profit setting percentage, you can view the MSRP for a new BOM item when you calculate its cost and sales price. The MSRP will be shown as the calculated sales price on the Calculate item cost page. You can also view the calculation details and see how the profit setting percentage is applied to the cost of the BOM item.
* The other options are not correct, because they do not allow you to view the MSRP for a new BOM item when you calculate its cost. Setting the sales price model field on the calculation group to item sales price would use the existing sales price of the BOM item from the Item price page, instead of calculating a new sales price based on a profit setting percentage. Using the category price rules to generate a trade agreement with the sales price would create a trade agreement line for the BOM item based on its category, but it would not show theMSRP when you calculate its cost. Adding a profit setting percentage to the released BOM product or to a cost group would have no effect, because these entities do not affect how the sales price of a BOM item is calculated.
1: Calculation groups 2: Profit settings 3: Create or modify calculation groups : [BOM calculations] : [Cost models and sales price models] : [Calculate costs and prices for manufactured items] : [Category pricing rules]


NEW QUESTION # 59
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
Break times are paid. The cost of a break time must be charged at the pay rate of the job in progress when the break starts.
You need to configure the break times to charge against the job in progress.
Which two actions should you perform? Each answer presents a partial solution.
NOTE; Each correct selection is worth one point.

  • A. Set Production Order Cost Category to No.
  • B. Set Direct Payroll Cost Standard Time to No.
  • C. Set Direct Payroll Cost Standard Time to Yes.
  • D. Set Production Order Cost Category to Yes.
  • E. Set Direct Payroll Cost Standard Time to Allocate.

Answer: C,D


NEW QUESTION # 60
A company uses Dynamics 365 Supply Chain Management. Technicians travel to several facilities to complete routine maintenance on equipment.
The company recently invested in new equipment. The technicians have no experience maintaining the new equipment. The technicians must be able to perform the following activities:
* Use apps on their mobile device to complete the maintenance.
* Find links to any visual step-by-step instructions related to the new equipment.
You need to configure features to assist the technicians.
Which features must you configure? To answer, select the appropriate options in the answer area.

Answer:

Explanation:

Explanation:


NEW QUESTION # 61
......

MB-335 Exam Dumps, MB-335 Practice Test Questions: https://www.free4dump.com/MB-335-braindumps-torrent.html