[Sep 06, 2024] Download Free SAP C_S43_2022 Real Exam Questions [Q37-Q59]

Share

[Sep 06, 2024] Download Free SAP C_S43_2022 Real Exam Questions

Pass Your Exam With 100% Verified C_S43_2022 Exam Questions


SAP C_S43_2022 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe and implement the process of corrective maintenance using traditional
  • Describe and implement technical asset structures following fundamental concepts
Topic 2
  • Organizational Units and Master Data
  • Describe and implement the process of breakdown maintenance using traditional
Topic 3
  • Describe UI technologies and client types used with SAP S
  • 4HANA Asset Management
  • Maintenance Processing - Advanced Functions
Topic 4
  • Describe the options for preventive maintenance using task lists
  • User Interface and Mobile Maintenance
Topic 5
  • Describe and implement the necessary organizational units
  • Time-based strategy and performance-based strategy maintenance plans

 

NEW QUESTION # 37
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

  • A. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
  • B. You do NOT have access to the SAP S/4HANA back-end system.
  • C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • D. You have access to the SAP S/4HANA back-end system

Answer: B,C

Explanation:
SAP S/4HANA Asset Management, Public Cloud Edition is a cloud-based solution that offers a simplified and standardized configuration of the system via the self-service configuration UI. You can use this UI to adjust the system settings according to your business needs. You do not have access to the SAP S/4HANA back-end system, as it is managed by SAP. SAP Asset Intelligence Network is a separate cloud-based solution that connects manufacturers, operators, and service providers of physical assets. You can use SAP Asset Intelligence Network to share and exchange asset information, but you cannot use it to configure SAP S/4HANA Cloud. References:
SAP S/4HANA Cloud, Public Edition - SAP Learning
SAP S/4HANA Cloud for Asset Management, Public Edition


NEW QUESTION # 38
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

  • A. ESRI Maps
  • B. Breakdown analytics
  • C. Cost analytics
  • D. Work orders and operations
  • E. Technical objects

Answer: A,D,E


NEW QUESTION # 39
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Actual finish date of the maintenance order
  • B. The date of the final confirmation
  • C. Technical completion date of the maintenance order
  • D. Planned date of the next call, independent of maintenance order dates

Answer: C


NEW QUESTION # 40
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Call horizon
  • B. Package offset
  • C. Scheduling type
  • D. Initial/subsequent buffer

Answer: A

Explanation:
Explanation
The call horizon is the parameter in a maintenance strategy that determines the start/end date of the maintenance order. The call horizon defines the percentage of the maintenance cycle that must be expired before the system generates a call object, such as a maintenance order or notification. The start date of the call object is calculated by adding the callhorizon to the last completion date of the maintenance plan. The end date of the call object is calculated by adding the maintenance cycle to the last completion date of the maintenance plan. The call horizon can be used to control the scheduling of preventive maintenance activities and ensure that they are performed within the planned time frame. References:
Preventive Maintenance in SAP S/4HANA, Lesson 2: Using Cycle Set Sequences, page 13-14 Highlights for Asset Management in SAP S/4HANA 2021, New Scope Items, Fig. 2: Standardized end-to-end process Proactive Maintenance (4HH)


NEW QUESTION # 41
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question

  • A. Release
    * Print
  • B. Release
    * Start Work
  • C. Complete
    * Close Report
  • D. Schedule
    * Dispatch

Answer: B,C

Explanation:
The Report and Repair Malfunction SAPUI5 app is a Fiori app that allows the technician to easily report that a technical object has a malfunction, plan the required repair work, as well as document and confirm the maintenance work when it's done1. With this app, the technician can perform the following activities:
C . Complete and Close Report. This is true because the technician can provide information about the malfunction and the job, confirm the job, and close the malfunction report. The technician can also attach pictures or descriptions of the damage, as well as a URL to provide further information about the technical object or the damage1.
D . Release and Start Work. This is true because the technician can release the malfunction report and start working on the job assigned to them. The technician can also view the details of the technical object, the history of recent repair work, the required spare parts, and the work centers involved1.
The technician cannot perform the following activities with this app:
A . Schedule and Dispatch. This is false because these activities are performed by the planner or the dispatcher, not the technician. The planner or the dispatcher can use the Resource Scheduling app to schedule and dispatch the maintenance orders and operations2.
B . Release and Print. This is false because the technician can only release the malfunction report, not print it. The technician can use the Repair Malfunctions - My Job List app to view the list of all work items assigned to them and their current status, but not to print them1. References: 1: Report and Repair Malfunction 2: Resource Scheduling


NEW QUESTION # 42
You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?

  • A. Tile Groups
  • B. Catalogs
  • C. Transactions
  • D. Web Dynpro Apps

Answer: A,B

Explanation:
SAPUI5 apps are web applications that use the SAPUI5 framework to create user interfaces for SAP business applications. SAPUI5 apps can be integrated into the SAP Fiori Launchpad, which is a shell that hosts SAP Fiori apps and provides them with services such as navigation, personalization, embedded support, and application configuration1.
To implement SAPUI5 apps in the SAP Fiori Launchpad, two mandatory elements are catalogs and tile groups.
Catalogs are collections of tiles and target mappings that define the SAPUI5 apps that can be launched from the SAP Fiori Launchpad. Tiles are the entry points to the SAPUI5 apps, and target mappings define the semantic objects and actions that are used to navigate to the SAPUI5 apps. Catalogs are created and maintained by administrators in the SAP Fiori Launchpad Designer.
Tile groups are collections of tiles that are displayed on the SAP Fiori Launchpad home page. Tile groups are created and maintained by end users or administrators in the SAP Fiori Launchpad. Tile groups allow users to organize and access the SAPUI5 apps that are relevant for their roles and tasks.
The other options are incorrect because:
Web Dynpro Apps are web applications that use the Web Dynpro framework to create user interfaces for SAP business applications. Web Dynpro Apps are not SAPUI5 apps, and they require a different integration approach to be launched from the SAP Fiori Launchpad.
Transactions are executable programs in the SAP system that perform specific business functions, such as creating a sales order or posting a goods receipt. Transactions are not SAPUI5 apps, and they require a different integration approach to be launched from the SAP Fiori Launchpad.
References: 1: SAPUI5 - Overview - Tutorialspoint : SAP Fiori Launchpad - SAP Help Portal : Integrating Web Dynpro ABAP Applications into the SAP Fiori Launchpad - SAP Help Portal : Integrating SAP GUI for HTML (WebGUI) Applications into the SAP Fiori Launchpad - SAP Help Portal


NEW QUESTION # 43
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

  • A. By manually activating the corresponding Business Feature in case Best Practices are not used.
  • B. Through Best Practices scope items 4HH and 4HI.
  • C. Phase-based maintenance is always active in all S/4HANA 2021 editions and above
  • D. By installing the corresponding enhancement pack and activating the related business function

Answer: A,B

Explanation:
Explanation
Phase-based maintenance processing is a new concept that was introduced in SAP S/4HANA Cloud 2011 and SAP S/4HANA 2021. It allows you to track the life cycle of the maintenance processes using predefined phases and sub-phases, instead of system and user statuses. Phase-based maintenance processing is activated in the SAP system through the following ways:
Through Best Practices scope items 4HH and 4HI. These are the new scope items for reactive and proactive maintenance that use the phase model for maintenance requests and orders. You can activate these scope items using the SAP Activate methodology and the SAP Best Practices Explorer12.
By manually activating the corresponding Business Feature in case Best Practices are not used. If you do not use the Best Practices scope items, you can still activate the phase model for maintenance requests and orders by using the Business Feature switch in the Customizing activity Define Settings for Maintenance Processing34.
Phase-based maintenance processing is not always active in all S/4HANA 2021 editions and above, as it depends on the scope items or the Business Feature switch. Therefore, answer B is incorrect. Phase-based maintenance processing is not activated by installing the corresponding enhancement pack and activating the related business function, as this is the old way of activating new features in SAP ERP. Therefore, answer C is also incorrect. References: SAP S/4HANA Cloud release of 2011 - Asset Management (Maintenance
... and Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs


NEW QUESTION # 44
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

  • A. Confirm time sheets
    * Attach documents
  • B. Display maps
    * Display and maintain technical objects
  • C. Change BOM
    * Create a work order on the ESRI map
  • D. Schedule resources
    * Change task list

Answer: A,B

Explanation:
The SAP Service and Asset Manager application enables maintenance workers to perform various tasks related to asset management, such as:
Confirm time sheets: Maintenance workers can record the time spent on work orders and operations, and submit them for approval. They can also view the status of their time confirmations and edit or delete them if needed. This functionality helps to track the labor costs and efficiency of the maintenance work1.
Attach documents: Maintenance workers can attach documents, such as photos, videos, audio files, or PDFs, to work orders, notifications, or equipment. This functionality helps to provide additional information or evidence for the maintenance work2.
Display maps: Maintenance workers can view the location of assets, work orders, or notifications on a map. They can also use the map to navigate to the destination, filter the map items, or switch between different map layers. This functionality helps to improve the spatial awareness and planning of the maintenance work3.
Display and maintain technical objects: Maintenance workers can view the details of technical objects, such as equipment, functional locations, or linear assets, and perform actions on them, such as creating notifications, work orders, or measurements. They can also edit the technical object data, such as the status, serial number, or manufacturer. This functionality helps to manage the lifecycle and performance of the assets.
The functionalities that are not available in the SAP Service and Asset Manager application for a maintenance worker are:
Schedule resources: This functionality is available in the SAP S/4HANA Asset Management application, which is a web-based application that supports the planning and scheduling of maintenance work. Maintenance planners and schedulers can use this application to assign resources, such as technicians, tools, or materials, to work orders and operations, and optimize the resource utilization and availability.
Change task list: This functionality is also available in the SAP S/4HANA Asset Management application, which allows maintenance planners and engineers to create and modify task lists, such as general task lists, equipment task lists, or functional location task lists. Task lists are used to define the sequence of operations and activities for recurring maintenance work.
Change BOM: This functionality is also available in the SAP S/4HANA Asset Management application, which allows maintenance engineers and technicians to create and change bills of materials (BOMs) for technical objects, such as equipment or functional locations. BOMs are used to list the components and materials that are required for the maintenance work.
Create a work order on the ESRI map: This functionality is not available in the SAP Service and Asset Manager application, which only supports viewing the existing work orders on the map. To create a work order on the map, the maintenance worker would need to use the SAP Work Manager application, which is another mobile application that integrates with the ESRI ArcGIS platform. The SAP Work Manager application allows the maintenance worker to create a work order by tapping on a map location, and assign the work order to a technician or a crew.
References: 1: SAP Service and Asset Manager User Guide - Maintenance Persona - Time Management 2: SAP Service and Asset Manager User Guide - Maintenance Persona - Attachments 3: SAP Service and Asset Manager User Guide - Maintenance Persona - Maps : [SAP Service and Asset Manager User Guide - Maintenance Persona - Technical Objects] : [SAP S/4HANA Asset Management - Resource Scheduling] : [SAP S/4HANA Asset Management - Task Lists] : [SAP S/4HANA Asset Management - Bills of Material] : [SAP Work Manager User Guide - Creating Work Orders on the Map]


NEW QUESTION # 45
What do you have to consider regarding a cross-plant planning scenario?

  • A. Only a maximum number of five maintenance plants can be assigned to a planning plant.
  • B. Multiple maintenance plants are assigned to a planning plant (n: 1).
  • C. Multiple planning plants are assigned to a maintenance plant (m: 1).
  • D. It is only possible within the same company code.

Answer: B


NEW QUESTION # 46
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

  • A. Change the pronty
  • B. Cancel status Released.
  • C. Change the estimated costs.
  • D. Book a goods receipt.

Answer: C,D

Explanation:
Explanation
When you cancel the technical completion of a maintenance order, you can perform the following operations:
Book a goods receipt for the materials that were ordered for the maintenance order. This operation is possible because canceling the technical completion reverses the goods issue that was posted when the order was technically completed. The materials are returned to the warehouse and can be received again when the goods receipt is posted1 Change the estimated costs of the maintenance order. This operation is possible because canceling the technical completion allows you to edit the cost elements and values in the order header and operations. You can also change the settlement rule and the budget of the order2 You cannot perform the following operations when you cancel the technical completion of a maintenance order:
Cancel the status Released of the maintenance order. This operation is not possible because the status Released is set when the order is created and cannot be reversed. The status Released indicates that the order is ready for execution and can be planned, scheduled, and confirmed2 Change the priority of the maintenance order. This operation is not possible because the priority is determined by the notification that triggered the order and cannot be changed in the order itself. The priority indicates the urgency and importance of the maintenance task3 References: 1: SAP Help Portal - Year-End Closing 3: Exploring Resource Scheduling - SAP Learning 2:
Cancel Technical Completion | SAP Community


NEW QUESTION # 47
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

  • A. Object information
  • B. Warranty category
  • C. Status profile
  • D. Usage period
  • E. Measuring point category

Answer: A,C,D


NEW QUESTION # 48
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP Asset Strategy and Performance Management
  • B. SAP S/4HANA Core Data Services
  • C. SAP Predictive Analysis
  • D. SAP Lumira Designer

Answer: D

Explanation:
Explanation
The Technical Object Breakdowns and Technical Object Damages app use SAP Lumira Designer to display data in a user-friendly and interactive way. SAP Lumira Designer is a tool that allows you to create analytical applications and dashboards based on SAP S/4HANA Core Data Services (CDS) views. SAP Asset Strategy and Performance Management and SAP Predictive Analysis are not components used to display data in this app, but they are other solutions that can help you optimize your asset management strategy and performance.
References:
Technical Object Breakdowns
Technical Object Damages
[SAP Lumira Designer]


NEW QUESTION # 49
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

  • A. It is a new business object with no connection to a maintenance notification.
  • B. It is mandatory to assign a task list to the maintenance request.
  • C. It always uses the risk-based assessment for prioritization.
  • D. It contains an additional screening phase where requests can be accepted or rejected.

Answer: D

Explanation:
Explanation
A maintenance request within the phase-based process differs from a maintenance notification in the standard process in that it contains an additional screening phase where requests can be acceptedor rejected. In the standard process, a maintenance notification is created and processed without any screening. In the phase-based process, a maintenance request is created and submitted for screening. The screening phase allows the supervisor to review the request and decide whether to accept it or reject it. If the request is accepted, it becomes a maintenance notification and moves to the planning phase. If the request is rejected, it is closed and no further action is taken1.
The other options are incorrect because:
A maintenance request does not always use the risk-based assessment for prioritization. It can also use a predefined priority list2.
A maintenance request is not a new business object with no connection to a maintenance notification. It is a maintenance notification that is in the initiation or screening phase3.
It is not mandatory to assign a task list to the maintenance request. A task list can be assigned to the maintenance order in the planning phase4.
References: Explaining the Phase-based Process, New Phase Model for the Maintenance Processes in S/4HANA Cloud, SAP S/4HANA Cloud release of 2011 - Asset Management (Maintenance Management), Introducing Reactive Maintenance (4HH)


NEW QUESTION # 50
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question

  • A. Set the call horizon to 90 days.
  • B. Set the call horizon to 25%.
  • C. Set the offset to 3 months
  • D. Set the call horizon to 75%

Answer: B


NEW QUESTION # 51
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question

  • A. In the list editing (single-level) for maintenance orders
  • B. In the report Material: Where-Used List
  • C. Within a maintenance order
  • D. In the material reservation list in inventory management

Answer: A,C

Explanation:
You can see the results of the material availability check for maintenance orders in two places: within a maintenance order and in the list editing (single-level) for maintenance orders.
Within a maintenance order, you can see the material availability status for each component in the Components tab. The status can be one of the following: Available, Not Available, Partially Available, or Not Checked. You can also see the availability date, which is the date on which the component can be fully available. You can access the maintenance order from the Manage Maintenance Orders app or the Change Maintenance Order app1.
In the list editing (single-level) for maintenance orders, you can see the material availability status for each order in the Material Availability column. The status can be one of the following: Available, Not Available, Partially Available, or Not Checked. You can also see the availability date, which is the date on which all the components for the order can be fully available. You can access the list editing from the List Editing (Single-Level) for Maintenance Orders app2.


NEW QUESTION # 52
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

  • A. Link PM task list with assigned inspection point type to a maintenance item.
  • B. Generate Inspection Lots assigned to maintenance order headers.
  • C. Generate Inspection Lols within the checklists view.
  • D. Record the usage decision for an Inspection Lot

Answer: B,D


NEW QUESTION # 53
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Start date
  • B. Scheduling period
  • C. Scheduling indicator
  • D. Factory calendar

Answer: A,B


NEW QUESTION # 54
What is the goal of embedded analytics in SAP S/4HANA?

  • A. To integrate BW Data Store Objects
  • B. To integrate BW Info Cubes
  • C. To allow both tactical and strategic analyses within the S/4HANA core
  • D. To combine transactional and analytical processing

Answer: D


NEW QUESTION # 55
Which of the following parameters are available when you define a new maintenance plan category? Note:
There are 3 correct answers to this question.

  • A. Order type
  • B. Call object
  • C. Maintenance activity type
  • D. Completion data
  • E. Change documents

Answer: A,B,C

Explanation:
Explanation
A maintenance plan category defines the parameters that are available when you create a maintenance plan.
The parameters include the maintenance activity type, the call object, and the order type. The maintenance activity type specifies the type of maintenance task, such as inspection, repair, or preventive maintenance. The call object determines the object that is called when the maintenance plan is executed, such as a notification, an order, or a service entry sheet. The order type defines the type of order that is created for the maintenance plan, such as a maintenance order, a service order, or a project order. The completion data and the change documents are not parameters of the maintenance plan category, but rather attributes of the maintenance plan itself. References: Elastic Compute Service:Change the category of a disk, Get Professional Support for your Cloud Business


NEW QUESTION # 56
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Maintenance order header
  • C. Notification activity
  • D. Maintenance order operation

Answer: B,D

Explanation:
Maintenance activity type is a key for the type of maintenance activity provided, such as repairs, shutdowns, regular activities, inspections, and so on. It is used to classify data according to the type of maintenance activity in cost evaluations, for example, total costs or number of orders for each technical object1.
Maintenance activity type can be used in the maintenance order header and the maintenance order operation. In the maintenance order header, it is used to specify the overall type of maintenance activity for the order. In the maintenance order operation, it is used to specify the type of maintenance activity for each operation within the order. The maintenance activity type in the operation can be different from the one in the header2.
Maintenance activity type cannot be used in the notification activity or the work center. Notification activity is a key for the type of activity performed in response to a notification, such as inspection, repair, or preventive maintenance. It is not related to the maintenance activity type. Work center is a key for the location where an operation is performed, such as a workshop, a laboratory, or a machine. It is also not related to the maintenance activity type.


NEW QUESTION # 57
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

  • A. The effective costs are posted as a credit memo to a price difference account
  • B. The effective costs are posted to the respective batch (valuation type).
  • C. The goods receipt for the batch refurbished is posted with the value of the moving average price
  • D. The goods receipt for the batch refurbished is posted with the value of the standard price.

Answer: A,D


NEW QUESTION # 58
You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?

  • A. A goods issue can be entered for planned and unplanned material
  • B. For stock material you always need a reservation
  • C. The pick list for materials can be printed before order release.
  • D. Material can be assigned at the order header level.

Answer: A,B

Explanation:
Material planning in the maintenance order is the process of determining the type, quantity, and availability of the materials required for carrying out the maintenance tasks. There are some considerations regarding material planning in the maintenance order, such as:
Material can be assigned at the operation level or the sub-operation level, but not at the order header level. This is because the material requirement is linked to the specific work that needs to be done in the order. Therefore, option A is incorrect1.
For stock material, you always need a reservation to ensure that the material is available when needed. A reservation is a request to the warehouse to keep a certain amount of material ready for withdrawal at a certain time. Therefore, option B is correct1.
A goods issue is the physical withdrawal of material from the warehouse. It can be entered for both planned and unplanned material in the maintenance order. Planned material is the material that is specified in the order before the actual execution of the work. Unplanned material is the material that is added to the order during or after the execution of the work. Therefore, option C is correct2.
The pick list is a document that lists all the materials that are required for a maintenance order. It can be printed after the order release, not before. The order release is the step that confirms that the order is ready to be executed and the materials can be withdrawn from the warehouse. Therefore, option D is incorrect3.
References: 1: Modelling Maintenance Processing - SAP Learning 2: [Manage Maintenance Orders - SAP Help Portal] 3: SAP S/4HANA Asset Management: Plants from a Maintenance ... - SAP PRESS


NEW QUESTION # 59
......

C_S43_2022 Dumps 100 Pass Guarantee With Latest Demo: https://www.free4dump.com/C_S43_2022-braindumps-torrent.html

C_S43_2022 Dumps PDF - C_S43_2022 Real Exam Questions Answers: https://drive.google.com/open?id=1nIx7A_3BtUY0a_LwClMLY5bSpe5zNQiI