NEW QUESTION # 34
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question
- A. TABIMJJPG
- B. PARDIST_SHD
- C. TABIM_SHADOW_*
- D. PARMVNT_UPG
Answer: A
NEW QUESTION # 35
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?
- A. Before the downtime starts
- B. Early in the downtime
- C. As part of the cleanup process
- D. At the end
Answer: D
NEW QUESTION # 36
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Near-Zero Downtime Maintenance (nZDM)
- B. Downtime Optimized DMO (DoDMO)
- C. Downtime Optimized Data Conversion (DoC)
- D. Near-Zero Downtime Technology (NZDT)
Answer: D
NEW QUESTION # 37
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
- A. Using R3load and network socket connection
- B. Using R3load and file transfer
- C. Using work processes and network socket connection
- D. Using R3load and memory pipes
Answer: D
NEW QUESTION # 38
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Switch to new repository (EU_SWITCH)
- B. Modification adjustment (SPDD)
- C. Conversion of application tables (PARCONVJJPG)
- D. Activation of dictionary objects (ACT_UPG)
Answer: B,D
NEW QUESTION # 39
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path is taken from the URL entered in the browser to start SUM
- B. The path was stored to the environment of user <sid>adm during registration
- C. The path was stored in file sumabap conf during registration
- D. The path was stored in file host_profile during registration
Answer: C
NEW QUESTION # 40
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The upgrade of the PRD must be finished before you start new development in the DEV.
- B. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- C. The transport between Unicode and non-Unicode systems is forbidden.
- D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
Answer: D
NEW QUESTION # 41
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. DMO can only be run with systems NW740 or NW731
- B. Target DB size will increase temporarily
- C. A
Answer: A,B
NEW QUESTION # 42
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:
- A. The DMO Guide
- B. The Application Guide
- C. The SAP S/HANA Conversion Guide
- D. The major SUM Guide
Answer: A,C
NEW QUESTION # 43
ICNV initialization does 3
- A. Creation of views
- B. Creation of flag
- C. AA
- D. Build index on flag column
Answer: A,B,D
NEW QUESTION # 44
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the most recent entries shown in file sapevt.trc
- B. Check the system log (transaction SM21) of the SAP system
- C. Check the messages shown by the SUM UI
- D. Check the most recent entries in SAPup.log
Answer: C,D
NEW QUESTION # 45
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Delete client 066 (Early Watch Client)
- B. Uninstall Fiori apps not released for SAP_UI 7.50
- C. Install add-on SAP Gateway 7.50
- D. Uninstall industry extensions not supported by SAP S/4HANA
Answer: A,B
NEW QUESTION # 46
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_IMPORT_ALL
- B. EU_CLONE_MIG_DT_RUN
- C. EU_CLONE_MIG_DT_CREATE
- D. EU_CLONE_MIG_SOT_RUN
Answer: B
NEW QUESTION # 47
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages that will be bound to the upgrade
- B. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- C. The SAP Support Packages found in the download directory
- D. The SAP Support Packages contained in the upgrade media
Answer: C
NEW QUESTION # 48
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. An overview about possible upgrade paths
- B. The link to different patch levels to SUM
- C. AA
- D. The corrections to the SUM Guide
Answer: A,B,D
NEW QUESTION # 49
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase RUN_RSPTBFIL _ISUTABU
- B. Phases DIFF*
- C. Phase DOWNCONF_DTTRANS
- D. Phases EU_IMPORT*
- E. Phase RUN_RSDBSCPY
Answer: B,C,D
NEW QUESTION # 50
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. You need to build up an SI check framework by applying SAP Notes
- B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- C. The errors from the SI checks must be solved, otherwise. SUM will report an error
- D. The SI checks are executed in the development system and the results are transported into the subsequent systems
Answer: A,B
NEW QUESTION # 51
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
- A. During the Execution roadmap step
- B. During the SUM technical downtime
- C. After SUM has ended
- D. Before the start of the SUM technical downtime
Answer: B
NEW QUESTION # 52
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In Process Control Center
- B. In SUM Parameters
- C. In SUM Phaselist
- D. In DMO Migration Preparation
Answer: A,B
NEW QUESTION # 53
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Using DMO when applying Support Packages to SAP ECC 6.07
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Upgrading to SAP ECC 6.08 without using DMO
- D. Updating to SAP ECC 6.07 using DMO
Answer: B,C
NEW QUESTION # 54
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION # 55
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. The repository is migrated in uptime
- B. TABIMJJPG is executed in uptime
- C. Dedicated application tables are migrated in uptime
- D. An additional temporary database is used during uptime
Answer: C
NEW QUESTION # 56
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
- A. Network capacity between exporting and importing R3load processes must be.
- B. The source system is non-Unicode and the target database is a scale-out system.
- C. SAP HANA Landscape Reorganization required a manual step to edit a file.
- D. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- E. The target database size increases temporarily because of the Shadow Repository.
Answer: C,D
NEW QUESTION # 57
......