NEW QUESTION 68
Which of the following steps are part of the procedure to update the standard price of the material ? 2 answers

  • A. Split the cost
  • B. Release the cost estimate
  • C. Mark the cost estimate
  • D. Archive the cost estimates

Answer: B,C

 

NEW QUESTION 69
What can you analyze in detail when you transfer the cost component split from product cost planning to costing-based CO-PA?

  • A. Sales revenues
  • B. Cost of goods manufactured
  • C. Variance categories
  • D. Cost of goods sold

Answer: D

 

NEW QUESTION 70
What is the difference when you perform repost line items (TA: KB61) compared to manua reposting of costs (KB11n) for a cost center? There are TWO correct answers for this question

  • A. The line item needs a reference to an Fl document
  • B. The report of the line item is updated in the original F1 document
  • C. There is the option to assign the line item to several receiver objects
  • D. The line item values are validated aqainst the original document

Answer: A,D

 

NEW QUESTION 71
You are setting up costing-based Profitability Analysis for your organization. How do you configure the different market segments?

  • A. As value fields
  • B. As divisions
  • C. As characteristics
  • D. As key figures

Answer: C

 

NEW QUESTION 72
What can you configure in the settlement profile?

  • A. Define document management parameters
  • B. Determine whether settlement is required
  • C. Determine an overhead key
  • D. Define a number range for settlement documents

Answer: A,B

 

NEW QUESTION 73
Which default values can you configure for the product cost collector? 2 answers

  • A. Costing variant for preliminary costing
  • B. Variance variant
  • C. Results Analaysis (RA) version
  • D. Results Analaysis (RA) key

Answer: A,D

 

NEW QUESTION 74
What can you specify when you create an activity type? There are THREE correct answers for this question

  • A. The activity type category for allocation
  • B. The valid receiving cost center types
  • C. The secondary costs G/L account for internal activity allocation
  • D. The primary costs G/L account for internal activity allocation
  • E. The valid sending cost center types

Answer: A,C,E

 

NEW QUESTION 75
Which settings can you configure per order type for the budget and availability control? There are TWO correct answers for this question

  • A. Budgeting on cost element level
  • B. Design budget manager
  • C. Budget data entry layout
  • D. Budget tolerance limits

Answer: A,D

 

NEW QUESTION 76
What do you do to create a primary cost component split? There are TWO correct answers for this question

  • A. Run an activity price calculation
  • B. Assign a cost component structure to the CO-version
  • C. Enter split activity prices manually
  • D. Use the cost splitting tool on cost centers

Answer: A,B

 

NEW QUESTION 77
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirement must be fulfilled ? 2 Answers

  • A. The type of the corresponding general ledger must be primary cost/revenue or secondary cost
  • B. Costing-based Profitability Analysis must be active
  • C. Account-based profitability must be active.
  • D. The type of the corresponding general ledger must be balance sheet

Answer: A,D

 

NEW QUESTION 78
Which views can you use to analyze the costing results within the costing run tool? There are THREE correct answers for this question

  • A. Variance report
  • B. Material list report
  • C. Work in progress report
  • D. Costing levels report
  • E. Analysis report

Answer: B,D,E

 

NEW QUESTION 79
You want to determine which operations of the oruting should be considered in a product cost calculation. How do you do this ? 2 Answers

  • A. By assigning a cost center top the work center in the operation
  • B. By defining a usage key in the header of the routing
  • C. By marking the cost indicator in the control key assigned to the operation
  • D. By marking the Relevance to Costing indicator in the operation

Answer: C,D

 

NEW QUESTION 80
Which currency types can you use for costing-based CO-PA? There are TWO correct answers for this question

  • A. Group currency
  • B. Company code currency
  • C. Controlling area currency
  • D. Operating concern currency

Answer: B,C

 

NEW QUESTION 81
How can you configure the transfer price solution in SAP S4/HANA? 2 Answers

  • A. Use separate segments for each valuation
  • B. Use separate currency types within the same ledger for each valuation
  • C. Use separate ledgers for each valuation
  • D. Use separate accounts for each valuation

Answer: C,D

 

NEW QUESTION 82
Which tasks can you perform on a production order in a make-to-order scenario with valuated stock?
There are TWO correct answers for this question

  • A. Settle the variances to CO-PA
  • B. Perform results analysis
  • C. Calculate production variances
  • D. Transfer reserves for realized costs

Answer: A,B

 

NEW QUESTION 83
Which of the following statements best describe Product Cost by Period? 2 Answers

  • A. It is used joint production with process orders
  • B. It is used when the focus of controlling is on a stable continuous production process
  • C. It is used to analyse work in a process based on actual costs
  • D. It is used in conjunction with a product cost collector

Answer: B,D

 

NEW QUESTION 84
You are setting up a direct internal allocation in SAP S4/HANA.
What are valid receivers for the activity? 3 answers

  • A. General ledger
  • B. Cost center
  • C. Network
  • D. Statistical overhead order
  • E. Sales order item

Answer: B,C,E

 

NEW QUESTION 85
On which document in the sales process is the profit initially entered?

  • A. Sales order
  • B. Service contract
  • C. Goods issue
  • D. Sales inquiry

Answer: A

 

NEW QUESTION 86
Which process determines the target costs of the cost object in a product cost by order scenario?

  • A. Work in process (WIP) calculation
  • B. Variance calculation
  • C. Accrual calculation
  • D. Actual costs calculation

Answer: B

 

NEW QUESTION 87
......